Mobile  |  About us  |  Photos  |  Videos  |  Subscriptions  |  RSS Feeds  |  Today's Paper  |  Classifieds  |  Contact Us
The Daily Star
WEDNESDAY, 23 MAY 2012
09:46 AM Beirut time
Weather    
Beirut
24 °C
Blom Index
1,164.8down
A+ A-
     
 
Advanced Search
Lebanon  
World Bank lends Lebanon $200 million for water project
Press Conference For Minister Gebran Basil Monday, January 23, 2012. (DalatiNohra/ The Daily Star)
Press Conference For Minister Gebran Basil Monday, January 23, 2012. (DalatiNohra/ The Daily Star)

BEIRUT: The Lebanese government signed Wednesday a $200 million World Bank loan to finance a $370 million project aiming to supply Beirut with water from the Awali River.

The step had been delayed from December 2010, when the World Bank board of directors approved the loan for the project, which the bank calls the Greater Beirut Water Supply Project.

The government was due to sign the agreement months ago after the Cabinet finally approved it last October.

“The project will provide 40 million cubic meters from the Awali River and will provide areas in Beirut lying bellow 300 meters all the way from Khalde to Nahr al-Mot. We are talking about providing [better access to] water for up to 1.6 million people,” Energy and Water Minister Gebran Bassil said during the signing ceremony in Beirut.

Lebanon representative of the World Bank Hadi al-Arabi sounded optimistic about the prospects of the project. He said it would vitalize the country’s economy, in need of some 10,000 jobs expected to be created by the project, within the next 3 to 4 years.

“I call on the Lebanese Parliament to quickly ratify [the decree authorizing the government to take the loan] to allow the World Bank to start financing the project and launch its implementation,” Arabi added.

Bassil said the project would rehabilitate the capital’s current water infrastructure all the way from “the source to the households.”

“The project consists of two main segments. The first will transport water through a canal from the Awali River to Khalde. The second includes building distribution networks and water tanks,” he said, adding: “16 medium water tanks, two big water reservoirs and 200 km of water networks will be built.”

But Bassil highlighted that the project would fall short of catering for the capital’s full demand for water unless it was coupled with the construction of more dams.

“We hope the project is completed soon but this alone is not sufficient to cover all the water needs of the city. It is fundamental that this step would be followed by the completion of the Bassari dam which can provide up to 130 million cubic meters of water,” Bassil said adding “otherwise we would have invested in infrastructure that we will not utilize.”

The World Bank said earlier deliberations toward realizing the project had started 15 years ago, but had faced numerous obstacles.

According to the World Bank, the project is designed to strengthen the capacity of the Beirut and Mount Lebanon Water Establishment, which is the utility responsible for the operation of the urban water supply in the project area.

A version of this article appeared in the print edition of The Daily Star on February 09, 2012, on page 5.
Home Lebanon
 
 
World bank / Lebanon / Economics
Advertisement
Comments  
Your feedback is important to us!
We invite all our readers to share with us their views and comments about this article.

Disclaimer: Comments submitted by third parties on this site are the sole responsibility of the individual(s) whose content is submitted. The Daily Star accepts no responsibility for the content of comment(s), including, without limitation, any error, omission or inaccuracy therein. Please note that your email address will NOT appear on the site. All fields are mandatory.

Name *
Email *
Country *
City *
Comment
*
Word Count: Left:
Toolbox
print
email
e-paper
e-paper
Related
Audi: Syria’s impact on Lebanese economy offset by other gains
Solidere shares drop to lowest levels since 2005 after unrest
Safadi: Private sector needed to reduce deficit
Transport unions call off strike but give Cabinet warning
Kafalat loans extended to SMEs reach $44.5 mln
LibanPack: Helping edible exports- interview
Security crisis takes toll on Beirut’s restaurants
Tourists cancel hotel reservations in Lebanon
Total Central Bank assets up 12.3 percent from 2011
Iran’s electricity offer bogged down
Advertisement
Most Popular
Viewed Searched e-mailed
1. Painting featuring Zuma’s genitals defaced
 
2. Hezbollah calls Future Movement a militia
 
3. At least 16 Lebanese abducted by Syria rebels near Aleppo
 
4. Mawlawi, newly freed: I confessed under duress
 
5. Nasrallah urges calm after kidnap of Lebanese in Syria
 
6. High hopes for release of Lebanese hostages
Advertisement
 
Follow us on Facebook Follow us on Twitter Follow us on Linked In Follow us on Google+ Subscribe to our Live Feed
 
Multimedia
Images Video  
World's tallest tower, the tokyo skytree, opens
The world's tallest tower, the tokyo skytree, opened to the public on Tuesday on a cloudy morning. Nearly 8,000 visitors were expected to take high-speed elevators up to the observation decks of the 634-meter (2,080-foot) tower to mark its opening.
View all view all
Rami G. Khouri
Rami G. Khouri
Egyptians as they really are, for once
Michael Young
Michael Young
Will Tripoli make Samir Geagea pay?
David Ignatius
David Ignatius
Is the bubble about to burst on the so-called China Model?
View all view all
 
cartoon
 
Click to View Articles
Advertisement
 
 
News
Business
Opinion
Sports
Culture
Technology
Entertainment
Privacy Policy | Anti-Spamming Policy | Disclaimer | Copyright Notice
© 2011 The Daily Star - All Rights Reserved - Designed and Developed By IDS